TANK FARM DEMOLITION
Infrastructure
Chelsea, MA
2012

Landing Studio worked in close collaboration with a salt dock operating company, legal counsel, demolition and abatement contractors, and teams of engineers for the full demolition of a former 13 million gallon asphalt and jet fuel terminal located on the Chelsea MA waterfront. The project involves the full abatement of all site architecture, clean-out of storage tanks and piping, and tactical salvage of specific site elements to be re-used in a park design to open in Spring 2013, including a series of large aluminum geodesic domes roofing over the 60 foot tall storage tanks.